News

  • Llanelli line opens at former colliery site

    Llanelli line opens at former colliery site

    by

    –

    THE Llanelli & Mynydd Mawr Railway held its first public event on September 3, and was considered a great success. The railway is being established at the old Cynheidre Colliery site in South Wales. More than 250 paying visitors attended, plus many children, who were free of charge, despite it being a wet and windy…

    Continue reading »

  • Didcot ‘Gronk’ smartened up

    Didcot ‘Gronk’ smartened up

    by

    –

    DIDCOT Railway Centre’s resident Class 08 No. 604 Phantom (08604) received a repaint in BR blue livery during the Great Western Society’s annual volunteers’ ‘Work Week’ in August. The project was undertaken in just over a week by a small team which carries out work on the centre’s diesel locomotives each year. In 2016, 0-6-0D No. DL26…

    Continue reading »

  • 125 Group gets three more coaches while power car remains at Old Oak Common

    125 Group gets three more coaches while power car remains at Old Oak Common

    by

    –

    THE 125 Group has bought another three Mk3 coaches, previously owned by DRS and stored at Barrow Hill. They are TSOs AC2G type, Nos. 12065, 12087 and 12134, and will be based at GCR (Nottingham). Once restored by group volunteers they will join the three coaches – Nos. 11074, 10206 and 12092 – to provide a…

    Continue reading »

  • Diesels running and stored at Embsay railway

    Diesels running and stored at Embsay railway

    by

    –

    THE Embsay & Bolton Abbey Steam Railway has a number of main line diesels on site, of which only one – a Class 37 – appears to be operational. Apparently stored out of use and beginning to look rather forlorn are Class 31 Nos. 31119 in BR Blue and D5600 in BR lined green, and…

    Continue reading »

  • First view of TransPennine livery on a Class 68 loco

    First view of TransPennine livery on a Class 68 loco

    by

    –

    TRANSPENNINE Express has released the first official image of a Class 68 that will work its loco-hauled services from next year. No. 68021 Tireless has been vinyled at DRS Gresty Bridge depot in the TPE house colours, one of 14 locos that will be used in conjunction with the order for 65 Mk5A carriages and…

    Continue reading »

  • ScotRail gets its first HST

    ScotRail gets its first HST

    by

    –

    SCOTRAIL has taken delivery of its first InterCity 125, which has been showcased in Aberdeen ahead of a driver training programme. After an initial move from Laira to Doncaster, four Mk3 trailers were left at Wabtec, with power car Nos. 43132 and 43021 continuing to Craigentinny depot in a 2+4 formation. Here, they were given…

    Continue reading »

  • Queensbury Tunnel to become cycle route?

    Queensbury Tunnel to become cycle route?

    by

    –

    A STUDY by sustainable transport charity Sustrans estimates reopening the disused Queensbury Tunnel as a cycle route could bring major benefits to the West Yorkshire economy. Sustrans’ findings suggest economic, health and tourism benefits of more than £37million could be generated over 30 years with the tunnel at the heart of a proposed network of…

    Continue reading »

  • London Bridge rebuild ‘on home straight’

    London Bridge rebuild ‘on home straight’

    by

    –

    MORE than 4,500 engineers worked a total in excess of 92,000 hours to deliver one of the most challenging and complex phases of the Thameslink Programme to date. The work took place between August 26 and September 2. New track and signalling equipment was installed at London Bridge on the lines serving Cannon Street, and…

    Continue reading »

  • Historic station hotel ‘at risk’

    Historic station hotel ‘at risk’

    by

    –

    AYR Station Hotel is under threat of demolition, writes Hugh Dougherty. The hotel was built by the Glasgow & South Western Railway in a French Renaissance design as an integral part of Ayr station. The 1885 Grade II-listed structure has been empty since it was sold to a Malaysian businessman for £750,000 in 2010, and…

    Continue reading »

  • £13million station project begins at Maghull North

    £13million station project begins at Maghull North

    by

    –

    WORK started on the construction of a new £13million Merseyrail station at Maghull North in mid-September. It is located between Maghull and Town Green stations on the Ormskirk branch of Merseyrail’s Northern Line, and is expected to open to passengers in May 2018. The new station will serve a nearby new housing development of 370…

    Continue reading »