First OLE for Corby route

by

MID-November saw Network Rail install its first new overhead line masts on the Midland Main Line since the ‘BedPan’ electrification of the early-1980s.

Around 40 masts were erected between Kettering and Corby, bolted to cylindrical steel piles, which were installed earlier this year.

The installation follows preparatory work undertaken by NR in recent months, including the raising of several overbridges, 10,000 yards of new lineside fencing, and upgraded track and signalling.

Article continues below…
Advert

Enjoy more Railway reading in the monthly magazine.
Click here to subscribe & save.

Electric operation is expected to be extended north of Bedford by December 2018, although the rest of the Midland Main Line electrification scheme – extending wires north to Nottingham and Sheffield – was scrapped by the Government in favour of bi-mode trains earlier this year. NETWORK RAIL

Read more News and Features in December’s issue of The RM – on sale now!


Advert
Subscribe to The Railway Magazine
Enjoy more of The Railway Magazine reading every month. Click here to subscribe.

Railway Reads

From the history of steam through to 21st century rail transport news, we have titles that cater for all rail enthusiasts. Covering diesels, modelling, steam and modern railways, check out our range of magazines and fantastic subscription offers.


Article Tags:

About the Author