,

Conwy Valley devastation as Storm Gareth wreaks havoc

by

TRAIN services on the 28-mile Conwy Valley line will remain suspended for several months after the line was substantially damaged by Storm Gareth on March 16.

Detailed inspections of the branch line by Network Rail using a drone have revealed multiple embankment washouts, lineside equipment flooded, and track, embankments, bridges, level crossings and stations requiring significant repairs. 

Track suspended in mid-air on the Conwy Valley line after an embankment washout following the most recent floods. NETWORK RAIL

Network Rail said specialist engineers are preparing a detailed programme of work to restore the line as quickly as possible, but the line could be closed for some time. 

Article continues below…
Advert

Enjoy more Railway reading in the monthly magazine.
Click here to subscribe & save.

The National Eisteddfod is being held at Llanrwst for a week in August, the site for which has been flooded too, but the need for rail services will put pressure on engineers to repair the line in the next four months. 

The line has suffered washouts a number of times in recent years after storms and floods, the last time being in March 2017 after Storm Doris.

Read more News and Features in the April 2019 issue of The RM – on sale now!

Article continues below…
Advert




Advert
Subscribe to The Railway Magazine
Enjoy more of The Railway Magazine reading every month. Click here to subscribe.

Railway Reads

From the history of steam through to 21st century rail transport news, we have titles that cater for all rail enthusiasts. Covering diesels, modelling, steam and modern railways, check out our range of magazines and fantastic subscription offers.


About the Author